CAT Practice Question and Answer
8Q: What does this symbol mean '&'? 2299 05b5cc6abe4d2b4197774cfc6
5b5cc6abe4d2b4197774cfc6- 1Caretfalse
- 2Barfalse
- 3Ampersandtrue
- 4Reversed Caretfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 3. "Ampersand"
Explanation :
Answer: C) Ampersand Explanation: '&' is a Logical Symbol and is called as Ampersand. ^ is called Caret - is called Bar v is called Reversed Caret.
Q: I have four fingers and a thumb, but not alive. Who am I? 2299 05b5cc615e4d2b4197774b6a7
5b5cc615e4d2b4197774b6a7- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer :
Explanation :
A glove. It has 5 fingers as we have but not alive.
Q: A number when subtracted by 1/7 th of itself gives the same value as the sum of all the angles of a triangle. What is the number? 2298 05b5cc619e4d2b4197774b700
5b5cc619e4d2b4197774b700- 1420false
- 2210true
- 370false
- 435false
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "210"
Explanation :
Answer: B) 210 Explanation: Let the required number be 'p' We know, sum of angles in a triangle are 180 deg According to given data, p - p/7 = 180 7p - p = 180 x 7 => 6p = 1260 => p = 1260/6 = 210
Q: Statements : All keys are locks. All locks are bangles. All bangles are cars. Conclusion : a. Some cars are locks. b. Some bangles are keys. c. Some cars are keys. 2298 05b5cc736e4d2b4197774f897
5b5cc736e4d2b4197774f897- 1Only a followsfalse
- 2Only c followsfalse
- 3Only a & b followsfalse
- 4a, b & c followstrue
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "a, b & c follows"
Explanation :
Answer: D) a, b & c follows Explanation: All locks are bangles + All bangles are cars = A + A = A= All locks are cars => Some cars are locks.Hence conclusion (a) follows.All keys are locks + All locks are bangles = A + A = A= All keys are bangles => some bangles are keys.Hence conclusion (b) follows.All keys are bangles + All bangles are cars = A + A = A= All keys are cars => Some cars are keys.Hence conclusion (C) follows. Thus all a, b and c follows.
Q: X can complete the work in 10 days, Y can do the same in 15 days. If they are hired for 5 days to do the work together, what is the work that left unfinished? 2297 05b5cc6bfe4d2b4197774da0a
5b5cc6bfe4d2b4197774da0a- 11/3false
- 22/3false
- 31/6true
- 45/6false
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 3. "1/6"
Explanation :
Answer: C) 1/6 Explanation: Given X can do in 10 days => 1 day work of X = 1/10 Y can do in 15 days => 1 day work of Y = 1/15 1day work of (X + Y) = 1/10 + 1/15 = 1/6 Given they are hired for 5 days => 5 days work of (X + Y) = 5 x 1/6 = 5/6 Therefore, Unfinished work = 1 - 5/6 = 1/6
Q: In a year, Holi was enjoyed on 6th March 9 AM and Deepawali was celebrated on 11th November 8 PM. The total time interval (in hours) between the two was ? 2297 05b5cc73ae4d2b4197774f8ab
5b5cc73ae4d2b4197774f8ab- 12101 hrsfalse
- 24125 hrsfalse
- 35124 hrsfalse
- 46011 hrstrue
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "6011 hrs"
Explanation :
Answer: D) 6011 hrs Explanation: From March 6th to November 11th, there are 250 days and Thus 250 x 24 hoursSo from Mar 6th 9AM to Nov 11th 8PM, there will be 250 x 24 + 11 hours = 6011 hrs.
Q: A boat takes 2 hours to travel from point A to B in still water. To find out its speed upstream, which of the following information is/are required? A. Distance between point A and B. B. Time taken to travel downstream from B to A. C. Speed of the stream of water. 2296 05b5cc69fe4d2b4197774c9f1
5b5cc69fe4d2b4197774c9f1- 1Only A and Bfalse
- 2Only B and Cfalse
- 3All are requiredfalse
- 4Any one pair of A and B, B and C or C and A is sufficienttrue
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "Any one pair of A and B, B and C or C and A is sufficient"
Explanation :
Answer: D) Any one pair of A and B, B and C or C and A is sufficient Explanation: Let distance between A & B = d kmLet speed in still water = x kmphLet speed of current = y kmph from the given data,d/x = 2 From A) we get dFrom B) we get d/x+yFrom C) we get y So, Any one pair of A and B, B and C or C and A is sufficient to give the answer i.e, the speed of upstream.
Q: A can do a piece of work in 10 days, B in 15 days. They work together for 5 days, the rest of the work is finished by C in two more days. If they get Rs. 3000 as wages for the whole work, what are the daily wages of A, B and C respectively (in Rs): 2295 05b5cc7d0e4d2b419777511d6
5b5cc7d0e4d2b419777511d6- 1200, 250, 300false
- 2300, 200, 250true
- 3200, 300, 400false
- 4None of thesefalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "300, 200, 250"
Explanation :
Answer: B) 300, 200, 250 Explanation: A's 5 days work = 50% B's 5 days work = 33.33% C's 2 days work = 16.66% [100- (50+33.33)] Ratio of contribution of work of A, B and C = 50 : 3313 : 1623 = 3 : 2 : 1 A's total share = Rs. 1500 B's total share = Rs. 1000 C's total share = Rs. 500 A's one day's earning = Rs.300 B's one day's earning = Rs.200 C's one day's earning = Rs.250

