Maths Practice Question and Answer

Q:

If ABC is an equilateral triangle and D is a point on BC such that AD⊥BC, then 

1176 0

  • 1
    AB : BD = 1 : 1
    Correct
    Wrong
  • 2
    AB : BD = 1 : 2
    Correct
    Wrong
  • 3
    AB : BD = 2 : 1
    Correct
    Wrong
  • 4
    AB : BD = 3 : 2
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "AB : BD = 2 : 1 "

Q:

If P = 99, then the value of P(P2+3P+3) is

1176 0

  • 1
    999
    Correct
    Wrong
  • 2
    999999
    Correct
    Wrong
  • 3
    99999
    Correct
    Wrong
  • 4
    99
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "999999"

Q:

The average of four consecutive even numbers is 9. Find the largest number. 

1176 0

  • 1
    12
    Correct
    Wrong
  • 2
    8
    Correct
    Wrong
  • 3
    6
    Correct
    Wrong
  • 4
    10
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "12"

Q:

ABC is an isosceles triangle such that AB = AC and ∠B = 35°. AD is the median to the base BC. Then ∠BAD is

1176 0

  • 1
    70°
    Correct
    Wrong
  • 2
    35°
    Correct
    Wrong
  • 3
    110°
    Correct
    Wrong
  • 4
    55°
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "110°"

Q:

Direction: What approximate value will come in place of the question mark (?) in the following question? (You are not expected to calculate the exact value)

(1110.02 + 89.81) ÷ ? – $${\sqrt{15}}$$= 15.98

1176 0

  • 1
    60
    Correct
    Wrong
  • 2
    120
    Correct
    Wrong
  • 3
    80
    Correct
    Wrong
  • 4
    75
    Correct
    Wrong
  • 5
    40
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "60 "

Q:

Directions: Answer the questions based on the information given below:
The following line graph shows revenue and expenditure of company A for 5 years (in Lakhs):

What is the average expenditure of the company A over the years?

1176 0

  • 1
    1000 lakhs
    Correct
    Wrong
  • 2
    1010 lakhs
    Correct
    Wrong
  • 3
    940 lakhs
    Correct
    Wrong
  • 4
    900 lakhs
    Correct
    Wrong
  • 5
    None of these
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "940 lakhs "

Q:

If the efficiency of Q increases by $$ {33{1\over 3}{\%}}$$ and P and Q start to work together, while at the same time R starts destroying the work. Find in how many days work will be completed.

1175 0

  • 1
    36 days
    Correct
    Wrong
  • 2
    48 days
    Correct
    Wrong
  • 3
    32 days
    Correct
    Wrong
  • 4
    28 days
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "36 days"

Q:

A alone can complete a work in 25 days and B alone can do the same work in 20 days. A started the work and after working 7 days B joined A to finish the remaining work. In how many days, the total work will be finished?

1175 0

  • 1
    8 days
    Correct
    Wrong
  • 2
    15 days
    Correct
    Wrong
  • 3
    9 days
    Correct
    Wrong
  • 4
    12 days
    Correct
    Wrong
  • 5
    None of these
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "15 days"

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully