Quantitative Aptitude Practice Question and Answer

Q: The wages of labourers in a factory increases in the ratio 22:25 and there was a reduction in the number of labourers in the ratio 15:11. Find the original wage bill if the present bill is Rs. 5000 ? 4934 0

  • 1
    Rs. 5500
    Correct
    Wrong
  • 2
    Rs. 6000
    Correct
    Wrong
  • 3
    Rs. 6200
    Correct
    Wrong
  • 4
    Rs. 6350
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "Rs. 6000"
Explanation :

Answer: B) Rs. 6000 Explanation: The wages of labourers in a factory increases in the ratio 22:25 and there was a reduction in the number of labourers in the ratio 15:11. Find the original wage bill if the present bill is Rs 5000 ?Ratio of increase of wages = 22:25Ratio of decrease of labourers = 15:11Compound ratio of wages of labourers = 22 x 15 : 25 x 11 = 330:275Final bill = Rs. 5000For 275 ratio wages = Rs. 5000For 1 ratio wages = 5000/275For 330 ratio wages = 5000/275 x 330 = Rs. 6000

Q: A and B runs around a circular track. A beats B by one round or 10 minutes. In this race, they had completed 4 rounds. If the race was only of one round, find the A's time over the course: 4922 0

  • 1
    8 min
    Correct
    Wrong
  • 2
    7.5 min
    Correct
    Wrong
  • 3
    12.5 min
    Correct
    Wrong
  • 4
    12 min
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "7.5 min"
Explanation :

Answer: B) 7.5 min Explanation: B runs around the track in 10 min.  i.e ,    Speed of B = 10 min per round  Therefore,  A beats B by 1 round   Time taken  by A to complete 4 rounds    = Time taken by B to complete 3 rounds    = 30 min    Therefore, A's speed = 30/4 min per round = 7.5 min per round  Hence, if the race is only of one round A's time over the course = 7 min 30 sec

Q: A box contains 3 blue marbles, 4 red, 6 green marbles and 2 yellow marbles. If two marbles are picked at random, what is the probability that they are either blue or yellow ? 4921 0

  • 1
    3/17
    Correct
    Wrong
  • 2
    4/21
    Correct
    Wrong
  • 3
    2/21
    Correct
    Wrong
  • 4
    5/17
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "2/21"
Explanation :

Answer: C) 2/21 Explanation: Given that there are three blue marbles, four red marbles, six green marbles and two yellow marbles.   Probability that both marbles are blue = ³C₂/¹⁵C₂ = (3 x 2)/(15 x 14) = 1/35 Probability that both are yellow = ²C₂/¹⁵C₂ = (2 x 1)/(15 x 14) = 1/105 Probability that one blue and other is yellow = (³C₁ x ²C₁)/¹⁵C₂ = (2 x 3 x 2)/(15 x 14) = 2/35   Required probability = 1/35 + 1/105 + 2/35 = 3/35 + 1/105 = 1/35(3 + 1/3) = 10/(3 x 35) = 2/21

Q: Navneet and Prabhat can complete a work in 20 and 25 days respectively. They work for Rs 4500. Find their wages. 4918 2

  • 1
    Rs 2000, Rs 2500
    Correct
    Wrong
  • 2
    Rs 3000, Rs 1500
    Correct
    Wrong
  • 3
    Rs 2500, Rs 2000
    Correct
    Wrong
  • 4
    Rs 3500, Rs 1000
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "Rs 2500, Rs 2000"

Q: The current of a stream at 1 kmph. A motor boat goes 35 km upstream and back to the starting point in 12 hours. The speed of the motor boat in still water is ? 4918 0

  • 1
    8 kmph
    Correct
    Wrong
  • 2
    6 kmph
    Correct
    Wrong
  • 3
    7.5 kmph
    Correct
    Wrong
  • 4
    5.5 kmph
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "6 kmph"
Explanation :

Answer: B) 6 kmph Explanation: Speed of the stream = 1Motor boat speed in still water be = x kmphDown Stream = x + 1 kmphUp Stream = x - 1 kmph[35/(x + 1)] + [35/(x - 1)] = 12x = 6 kmph

Q: In one hour, a boat goes 12 km/hr along the stream and 6 km/hr against the stream. The speed of the boat in still water (in km/hr) is: 4889 0

  • 1
    9
    Correct
    Wrong
  • 2
    8
    Correct
    Wrong
  • 3
    7
    Correct
    Wrong
  • 4
    7.5
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "9"
Explanation :

Answer: A) 9 Explanation: Speed in still water = Average of Speed in Upstream and speed in Downstream = 1/2 (12 + 6) kmph = 9 kmph.

  • Show AnswerHide Answer
  • Workspace

Answer : 4. "20 years"
Explanation :

Answer: D) 20 years Explanation: Present total age of the members = 26(5) = 130 years.   Present age of the youngest member = 10 years   Present total age of the remaining four members = 130 -10 = 120 years   Their average age at the time of the birth of the youngest member = 120-4×104 = 30 - 10 = 20 years.

Q: Shyam can work at thrice the speed than Naresh. If together they can complete a work in 32 days, in how many days can Naresh alone complete it? 4875 0

  • 1
    120
    Correct
    Wrong
  • 2
    128
    Correct
    Wrong
  • 3
    124
    Correct
    Wrong
  • 4
    144
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "128"

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully