Bank Exams Practice Question and Answer

Q: What holds the sides of the DNA ladder together? 3239 0

  • 1
    Polar covalent bonds
    Correct
    Wrong
  • 2
    Ionic bonds
    Correct
    Wrong
  • 3
    Metallic bonds
    Correct
    Wrong
  • 4
    Covalent bonds
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 4. "Covalent bonds"
Explanation :

Answer: D) Covalent bonds Explanation: Deoxyribose, which is a pentose, and a phosphate group are the two molecules together form the two sides of the DNA i.e, A sugar (deoxyribose) and a phosphate. DNA is a double-stranded molecule twisted into a helix (think of a spiral staircase). Each spiraling strand, comprised of a sugar-phosphate backbone and attached bases, is connected to a complementary strand by non-covalent hydrogen bonding between paired bases. The bases are adenine (A), thymine (T), cytosine (C) and guanine (G). A and T are connected by two hydrogen bonds. G and C are connected by three hydrogen bonds.

Q: A garrison of 2000 men has provisions for 54 days. At the end of 15 days, a reinforcement arrives, and it is now found that the provisions will last only for 20 days more. What is the reinforcement ? 3238 0

  • 1
    1900
    Correct
    Wrong
  • 2
    2100
    Correct
    Wrong
  • 3
    1700
    Correct
    Wrong
  • 4
    2000
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "1900"
Explanation :

Answer: A) 1900 Explanation: Given 2000 ---- 54 days The provisions for 2000 men for 39 days can be completed by 'm' men for only 20 days. i.e, 2000 ----- 39 days == m ---- 20 days => m x 20 = 2000 x 39 m = 3900 So total men for 20 days is 3900 => 2000 old and 1900 new reinforcement. Hence, reinforcement = 1900.

Q: If 10 men take 15 days to complete a work. In how many days will 37 men complete the work? 3236 0

  • 1
    3 days
    Correct
    Wrong
  • 2
    4 days
    Correct
    Wrong
  • 3
    5 days
    Correct
    Wrong
  • 4
    6 days
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "4 days"
Explanation :

Answer: B) 4 days Explanation: Given 10 men take 15 days to complete a work => Total mandays = 15 x 10 = 150 Let the work be 150 mandays. => Now 37 men can do 150 mandays in 150/37 =~ 4 days

Q: How many number of weights do you need to weight 31 kg of Rice if you have one kg of weight stone ? 3232 0

  • 1
    3
    Correct
    Wrong
  • 2
    5
    Correct
    Wrong
  • 3
    7
    Correct
    Wrong
  • 4
    9
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "5"
Explanation :

Answer: B) 5 Explanation: There are total 5 ways.we have only one kg of weight so,2kg = 1kg + 1kg4kg = 1 + 2 + 18kg = 1 + 2 + 4 + 116kg = 1 + 2 + 4 + 8 + 131kg = 1 + 2 + 4 + 8 + 16So 5 weights are needed.

Q: Study of sound is called 3231 0

  • 1
    Agronomy
    Correct
    Wrong
  • 2
    Accoustics
    Correct
    Wrong
  • 3
    Aesthetics
    Correct
    Wrong
  • 4
    Aeronautics
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "Accoustics"
Explanation :

Answer: B) Accoustics Explanation: Accoustics is a subject deals with the Study of sound   Aesthetics is a Philosophy of fine arts   The science or art of flight is called Aeronautics   The science of soil management is called Agronomy.

Q: A rectangular block has the dimensions 5x6x7 cm it is dropped into a cylindrical vessel of radius 6cm and height 10 cm. If the level of the fluid in the cylinder rises by 4 cm, What portion of the block is immersed in the fluid ? 3224 0

  • 1
    22/7 x 24/35
    Correct
    Wrong
  • 2
    22/7 x 36 x 4
    Correct
    Wrong
  • 3
    22/7 x 36/5
    Correct
    Wrong
  • 4
    22/7 x 37/21
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "22/7 x 24/35"
Explanation :

Answer: A) 22/7 x 24/35 Explanation: Since level of water increased in cylinder by height 4.  This is because of the rectangular block .   Therefore , area of rectangular block immersed in water is  = 227×6×6×4   Thats why portion of block immersed in water is  = (22/7 * 36 * 4) / total vol. of rectangle  = (22/7 * 36 * 4)/ (7*5*6)  = (22/7 * 24)/ 35.

Q: Find the odd one out of the floowing number series? 270, 261, 279, 252, 289, 243 3222 0

  • 1
    270
    Correct
    Wrong
  • 2
    279
    Correct
    Wrong
  • 3
    289
    Correct
    Wrong
  • 4
    243
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "289"
Explanation :

Answer: C) 289 Explanation: Here the given number series is 270, 261, 279, 252, 289, 243 270 - 9 = 261 261 + 18 = 279 279 - 27 = 252 252 + 36 = 288 (not equals to 289) 288 - 45 = 243   Hence, the odd number in the given number series is 289.

Q: At which of the following places is the College of Defence Management located ? 3221 0

  • 1
    Pune
    Correct
    Wrong
  • 2
    Secunderabad
    Correct
    Wrong
  • 3
    Chennai
    Correct
    Wrong
  • 4
    Dehradun
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "Secunderabad"
Explanation :

Answer: B) Secunderabad Explanation:

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully