Practice Question and Answer

  • Show AnswerHide Answer
  • Workspace

Answer : 3. "37"
Explanation :

Answer: C) 37 Explanation: If we want to pack the drinks in the least number of cans possible, then each can should contain the maximum numbers of liters possible.As each can contains the same number liters of a drink, the number of liters in each can is a comman factor for 80,144 and 368; and it is also the highest such factor, as we need to store the maximum number of liters in each can. So, the number of liters in each can  = HCF of 80,144 and 368 = 16 liters. Now, number of cans of Maaza = 80/16 = 5 Number of cans of Pepsi = 144/16 = 9 Number of cans of Sprite = 368/16 = 23 Thus, the total number of cans required = 5 + 9 + 23 = 37

Q: A and B can do a work in 4 hours and 12 hours respectively. A starts the work at 6 AM and they work alternately for one hour each. When will the work be completed? 2467 0

  • 1
    4 days
    Correct
    Wrong
  • 2
    5 days
    Correct
    Wrong
  • 3
    6 days
    Correct
    Wrong
  • 4
    7 days
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "6 days"
Explanation :

Answer: C) 6 days Explanation: Work donee by A and B in the first two hours, working alternatively = First hour A + Second hour B = (1/4) + (1/12) = 1/3. Thus, the total time required to complete the work  = 2 (3) = 6 days

Q: A, B and C can do a piece of work in 24 days, 30 days and 40 days respectively. They began the work together but C left 4 days before the completion of the work. In how many days was the work completed? 1390 0

  • 1
    11 days
    Correct
    Wrong
  • 2
    12 days
    Correct
    Wrong
  • 3
    13 days
    Correct
    Wrong
  • 4
    14 days
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "11 days"
Explanation :

Answer: A) 11 days Explanation: One day's work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10. C leaves 4 days before completion of the work, which means only A and B work during the last 4 days. Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10. Remaining Work = 7/10, which was done by A,B and C in the initial number of days.  Number of days required for this initial work = 7 days.  Thus, the total numbers of days required = 4 + 7 = 11 days.

Q: Which of the following is always with bargain? 1547 0

  • 1
    Sumptuousness
    Correct
    Wrong
  • 2
    Exchange
    Correct
    Wrong
  • 3
    Triviality
    Correct
    Wrong
  • 4
    Eloquence
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "Exchange"
Explanation :

Answer: B) Exchange Explanation:

Q: Which of the following is always associated with justice? 2231 0

  • 1
    Hypocrisy
    Correct
    Wrong
  • 2
    Magnanimity
    Correct
    Wrong
  • 3
    Legitimacy
    Correct
    Wrong
  • 4
    Diminutiveness
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "Legitimacy"
Explanation :

Answer: C) Legitimacy Explanation:

Q: If you find yourself in a situation where you are required to make a power - point presentation and you are already bogged down by too much work, as the manager what would you do? 1513 0

  • 1
    Take an alternative mode of presentation
    Correct
    Wrong
  • 2
    Cancel the seminar and reschedule according to your convenience
    Correct
    Wrong
  • 3
    Pass the buck to your subordinate, you are the boss, no one can question you
    Correct
    Wrong
  • 4
    Prioritise your work and try to squeeze out time for it
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 4. "Prioritise your work and try to squeeze out time for it"
Explanation :

Answer: D) Prioritise your work and try to squeeze out time for it Explanation: A manager is one who has the expertise to manage tasks properly.So, it becomes his prime responsibility to rearrange his work schedule properly and work out the required time for the project rather than postpone it or hand it over to some one else.

Q: An Angry customer wants to meet the senior manager for grievance reporting. What will you do? 2701 0

  • 1
    Talk to him yourself
    Correct
    Wrong
  • 2
    Be patient and try to cool him down
    Correct
    Wrong
  • 3
    Try to remove his inconveniences by consulting seniors
    Correct
    Wrong
  • 4
    Tell him it is not easy to meet the senior manager
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "Be patient and try to cool him down"
Explanation :

Answer: B) Be patient and try to cool him down Explanation:

Q: You are a sincere and dedicated manager in a reputed five-star hotel. You have been appointed as the Chief Manager of the Guwahati branch which needs to be developed.Your Salary has been hiked. 6012 0

  • 1
    You give it a shot for 2 months and see how it goes
    Correct
    Wrong
  • 2
    You accept the challenge and go ahead with the project
    Correct
    Wrong
  • 3
    You accept another offer and leave the job
    Correct
    Wrong
  • 4
    You crib for limited resources and try to convince the superior to send somebody else instead of yoiu
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "You accept the challenge and go ahead with the project"
Explanation :

Answer: B) You accept the challenge and go ahead with the project Explanation:

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully