Practice Question and Answer
8Q: A drink vendor has 80 liters of Mazza, 144 liters of Pepsi, and 368 liters of Sprite. He wants to pack them in cans, so that each can contains the same number of liters of a drink, and doesn't want to mix any two drinks in a can. What is the least number of cans required? 1773 05b5cc7b9e4d2b419777509aa
5b5cc7b9e4d2b419777509aa- 135false
- 236false
- 337true
- 438false
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 3. "37"
Explanation :
Answer: C) 37 Explanation: If we want to pack the drinks in the least number of cans possible, then each can should contain the maximum numbers of liters possible.As each can contains the same number liters of a drink, the number of liters in each can is a comman factor for 80,144 and 368; and it is also the highest such factor, as we need to store the maximum number of liters in each can. So, the number of liters in each can = HCF of 80,144 and 368 = 16 liters. Now, number of cans of Maaza = 80/16 = 5 Number of cans of Pepsi = 144/16 = 9 Number of cans of Sprite = 368/16 = 23 Thus, the total number of cans required = 5 + 9 + 23 = 37
Q: A and B can do a work in 4 hours and 12 hours respectively. A starts the work at 6 AM and they work alternately for one hour each. When will the work be completed? 2467 05b5cc7b9e4d2b419777509a5
5b5cc7b9e4d2b419777509a5- 14 daysfalse
- 25 daysfalse
- 36 daystrue
- 47 daysfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 3. "6 days"
Explanation :
Answer: C) 6 days Explanation: Work donee by A and B in the first two hours, working alternatively = First hour A + Second hour B = (1/4) + (1/12) = 1/3. Thus, the total time required to complete the work = 2 (3) = 6 days
Q: A, B and C can do a piece of work in 24 days, 30 days and 40 days respectively. They began the work together but C left 4 days before the completion of the work. In how many days was the work completed? 1390 05b5cc7b9e4d2b419777509a0
5b5cc7b9e4d2b419777509a0- 111 daystrue
- 212 daysfalse
- 313 daysfalse
- 414 daysfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 1. "11 days"
Explanation :
Answer: A) 11 days Explanation: One day's work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10. C leaves 4 days before completion of the work, which means only A and B work during the last 4 days. Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10. Remaining Work = 7/10, which was done by A,B and C in the initial number of days. Number of days required for this initial work = 7 days. Thus, the total numbers of days required = 4 + 7 = 11 days.
Q: Which of the following is always with bargain? 1547 05b5cc7b9e4d2b4197775099b
5b5cc7b9e4d2b4197775099b- 1Sumptuousnessfalse
- 2Exchangetrue
- 3Trivialityfalse
- 4Eloquencefalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "Exchange"
Explanation :
Answer: B) Exchange Explanation:
Q: Which of the following is always associated with justice? 2231 05b5cc7b9e4d2b41977750996
5b5cc7b9e4d2b41977750996- 1Hypocrisyfalse
- 2Magnanimityfalse
- 3Legitimacytrue
- 4Diminutivenessfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 3. "Legitimacy"
Explanation :
Answer: C) Legitimacy Explanation:
Q: If you find yourself in a situation where you are required to make a power - point presentation and you are already bogged down by too much work, as the manager what would you do? 1513 05b5cc7b9e4d2b41977750991
5b5cc7b9e4d2b41977750991- 1Take an alternative mode of presentationfalse
- 2Cancel the seminar and reschedule according to your conveniencefalse
- 3Pass the buck to your subordinate, you are the boss, no one can question youfalse
- 4Prioritise your work and try to squeeze out time for ittrue
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "Prioritise your work and try to squeeze out time for it"
Explanation :
Answer: D) Prioritise your work and try to squeeze out time for it Explanation: A manager is one who has the expertise to manage tasks properly.So, it becomes his prime responsibility to rearrange his work schedule properly and work out the required time for the project rather than postpone it or hand it over to some one else.
Q: An Angry customer wants to meet the senior manager for grievance reporting. What will you do? 2701 05b5cc7b9e4d2b4197775098c
5b5cc7b9e4d2b4197775098c- 1Talk to him yourselffalse
- 2Be patient and try to cool him downtrue
- 3Try to remove his inconveniences by consulting seniorsfalse
- 4Tell him it is not easy to meet the senior managerfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "Be patient and try to cool him down"
Explanation :
Answer: B) Be patient and try to cool him down Explanation:
Q: You are a sincere and dedicated manager in a reputed five-star hotel. You have been appointed as the Chief Manager of the Guwahati branch which needs to be developed.Your Salary has been hiked. 6012 05b5cc7b9e4d2b41977750987
5b5cc7b9e4d2b41977750987- 1You give it a shot for 2 months and see how it goesfalse
- 2You accept the challenge and go ahead with the projecttrue
- 3You accept another offer and leave the jobfalse
- 4You crib for limited resources and try to convince the superior to send somebody else instead of yoiufalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "You accept the challenge and go ahead with the project"
Explanation :
Answer: B) You accept the challenge and go ahead with the project Explanation:

