Practice Question and Answer
8 Q:The following sentence has been split into four segments. Identify the segment that contains a grammatical error.
She watched / the thief who / steal the purse / in the bus.
2702 0649ab3511a612ce001f67d84
649ab3511a612ce001f67d84- 1the thief whofalse
- 2in the busfalse
- 3steal the pursetrue
- 4She watchedfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 3. "steal the purse"
Explanation :
The correct form should be "the thief who stole the purse." The verb "steal" should be replaced with "stole" to match the past tense.
Q: In a specific code language, a driver is called a farmer, a farmer is called an engineer, and an engineer is called a doctor. So who will plough the field?
2702 05eba224a64cb07648b644431
5eba224a64cb07648b644431- 1Driverfalse
- 2Farmerfalse
- 3Engineertrue
- 4Doctorfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 3. "Engineer"
Q: Select the most appropriate word to fill in the blank.
This is the girl ______ is going to IIT, Delhi.
2701 0605a95028a26422fe255dfc8
605a95028a26422fe255dfc8This is the girl ______ is going to IIT, Delhi.
- 1whotrue
- 2thatfalse
- 3whichfalse
- 4whomfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 1. "who"
Q: Rajesh rows in still water with a speed of 4.5 kmph to go to a certain place and comes back. Find his average speed for the whole journey, if the river is flowing with a speed of 1.5 kmph? 2701 05b5cc67ee4d2b4197774c245
5b5cc67ee4d2b4197774c245- 12 kmphfalse
- 24 kmphtrue
- 36 kmphfalse
- 48 kmphfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "4 kmph"
Explanation :
Answer: B) 4 kmph Explanation: Let the distance in one direction = k kms Speed in still water = 4.5 kmph Speed of river = 1.5 Hence, speed in upstream = 4.5 - 1.5 = 3 kmph Speed in downstream = 4.5 + 1.5 = 6 kmph Time taken by Rajesh to row upwards = k/3 hrs Time taken by Rajesh to row downwards = k/6 hrs Now, required Average speed =Total distanceTotal speed = 2kk3 + k6 = 2k x 186k + 3k = 4 kmph Therefore, the average speed of the whole journey = 4kmph.
Q: A contractor undertook to complete a piece of work in 120 Days and employed 140 men upon it. At the end of 66 days only half of the work was done,so he put on 25 extra men. By how much time did he exceed the specific time ? 2701 05b5cc709e4d2b4197774f2ad
5b5cc709e4d2b4197774f2ad- 12 daystrue
- 23 daysfalse
- 34 daysfalse
- 45 daysfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 1. "2 days"
Explanation :
Answer: A) 2 days Explanation: work done=total number of person x number of days;half of work done = 140 x 66;For half of remaining work 25 extra men are added.Therefore, total men for half work remaining = 140 + 25 = 165;Let 2nd half work will be completed in K days;140 x 66 = 165 x KK = 122;Hence, extra days => 122-120 = 2days.
Q: What kind of tree can you carry in your hand? 2700 05b5cc651e4d2b4197774bcfe
5b5cc651e4d2b4197774bcfe- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer :
Explanation :
Palm tree.
Q: Who regulates the Mutual Funds in India?
2700 05e785c4cf012602a3def3370
5e785c4cf012602a3def3370- 1FRBIfalse
- 2SEBItrue
- 3SIDBIfalse
- 4RBIfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "SEBI"
Q: Cost of 24 bats and 32 sticks is Rs 5600. What is the price of 3 bats and 4 sticks?
2700 05da0551400e22578c9e9a004
5da0551400e22578c9e9a004- 1Rs 1400false
- 2Rs 2800false
- 3Rs 700true
- 4Data Inadequatefalse
- 5None of thesefalse
- Show AnswerHide Answer
- Workspace
- SingleChoice

