Aptitude Practice Question and Answer
8 Q: If A and B are the HCF and LCM respectively of two algebraic expressions x and y, and A + B = x + y, then the value of A3 + B3 is
2432 05dca4b85582669277c295f80
5dca4b85582669277c295f80- 1$$x^3-y^3 $$false
- 2$$x^3$$false
- 3$$y^3$$false
- 4$$x^3 + y^3$$true
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "$$x^3 + y^3$$"
Q: Speed of a boat in still water is 6 km/hr and speed of the current is 2 km/hr. If boat takes four hours more in upstream than in the downstream to cover ‘D’ km, then find time take by boat to cover ‘D’ km in still water?
2432 062e0fd56e50b894c6f5850ee
62e0fd56e50b894c6f5850ee- 15 hours 30 minutesfalse
- 25 hours 45 minutesfalse
- 35 hours 10 minutesfalse
- 45 hours 20 minutestrue
- 55 hours 40 minutesfalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "5 hours 20 minutes"
Q: A man left 9 minutes early than the scheduled time and in order to reach the destination 378 km away in time, it has to slow its speed by 6 km/h from the usual. What is the usual speed (in km/hr.) of the man?
2431 05e95b6de855a3d5998809717
5e95b6de855a3d5998809717- 156false
- 263false
- 394.5false
- 4126true
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "126"
Q:The following line graph gives the percentage of the number of candidates who qualified an examination out of the total number of candidates who appeared for the examination over a period of seven years from 1994 to 2000.

If the number of candidates qualified in 1998 was 21200, what was the number of candidates appeared in 1998?
2431 05e799a058560ba13b0273678
5e799a058560ba13b0273678- 132000false
- 228500false
- 326500true
- 425000false
- 5None of thesefalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 3. "26500"
Q: If four coins are tossed together, what is the probability of at least getting 2 heads?
2429 05e78ba2d50339c7366618256
5e78ba2d50339c7366618256- 113\16false
- 211\16true
- 39\16false
- 415\16false
- 5None of thesefalse
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 2. "11\16"
Q: 12 men complete a work in 18 days. Six days after they had started working, 4 men joined them. How many days will all of them take to complete the remaining work?
2429 05dbfba79656bc31fa3165069
5dbfba79656bc31fa3165069- 110 daysfalse
- 212 daysfalse
- 315 daysfalse
- 49 daystrue
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 4. "9 days"
Q: The area of two equilateral triangles are in the ratio 25 : 36 . Their altitudes will be in the ratio:
2429 05dd3da1ac2282c484e4715f1
5dd3da1ac2282c484e4715f1- 136 : 25false
- 225 : 36false
- 35 : 6true
- 4√5 : √6false
- Show AnswerHide Answer
- Workspace
- SingleChoice
Answer : 3. "5 : 6 "
Explanation :
the ratio will be squre root of triangle so that answer will be 5:6
Q: In the given filed the area under triangular shape is

2429 05e463f9565b2ec50e4298fea
5e463f9565b2ec50e4298fea- 1250true
- 2230false
- 3240false
- 4280false
- Show AnswerHide Answer
- Workspace
- SingleChoice

