Aptitude Practice Question and Answer

Q:

If tan (11 θ)=cot (7θ), then what is the value of sin2(6 θ) + Sec2 (9 θ) + cosec2(12 θ)?

1969 0

  • 1
    $$ {23\over 6}$$
    Correct
    Wrong
  • 2
    $$ {35\over 12}$$
    Correct
    Wrong
  • 3
    $$ {31\over 12}$$
    Correct
    Wrong
  • 4
    $$ {43\over 12}$$
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 4. "$$ {43\over 12}$$"

Q:

If a cube whose side is 7.5 cm, what will be its volume?

1968 0

  • 1
    $$ {421.875\ cm^{3}}$$
    Correct
    Wrong
  • 2
    $$ {759.375\ cm^{3}}$$
    Correct
    Wrong
  • 3
    $$ {631.810\ cm^{3}}$$
    Correct
    Wrong
  • 4
    $$ {210.94\ cm^{3}}$$
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "$$ {421.875\ cm^{3}}$$ "

Q:

A cistern can be filled by two pipes A and B in 4 hours and 6 hours respectively. When full, the tank can be emptied by a third pipe C in 8 hours. If all the taps be turned on at the same time, the cistern will be full in 

1968 0

  • 1
    $$ {2}{2\over 7}{\ hours}$$
    Correct
    Wrong
  • 2
    $$ {3}{3\over 7}{\ hours}$$
    Correct
    Wrong
  • 3
    $$ {4}{3\over 7}{\ hours}$$
    Correct
    Wrong
  • 4
    $$ {2}{5\over 7}{\ hours}$$
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "$$ {3}{3\over 7}{\ hours}$$"

Q:

 A 450 meter long train crosses a bridge 650 meters long in 36 seconds. What is speed (in km/hr) of the train? 

1967 0

  • 1
    125
    Correct
    Wrong
  • 2
    150
    Correct
    Wrong
  • 3
    110
    Correct
    Wrong
  • 4
    95
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "110"

Q:

Pipes P and Q can fill a tank in 18 and 27 minutes, respectively, whereas Pipe R can empty the full tank in 54 minutes.  P and Q were opened together for 6 minutes and then   closed and R was opened. The tank was emptied by R alone in :

1966 0

  • 1
    35 minutes
    Correct
    Wrong
  • 2
    45 minutes
    Correct
    Wrong
  • 3
    30 minutes
    Correct
    Wrong
  • 4
    40 minutes
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "30 minutes"

Q:

8 men can do a work in 12 days. After 6 days of work, 4 more men were engaged to finish the work. In how many days would the remaining work be completed? 

1966 0

  • 1
    4 days
    Correct
    Wrong
  • 2
    5 days
    Correct
    Wrong
  • 3
    2 days
    Correct
    Wrong
  • 4
    3 days
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "4 days "

Q:

Alex sold his goods after announcing two successive discounts of 30% each. The effective discount altogether is-

1966 0

  • 1
    52%
    Correct
    Wrong
  • 2
    49%
    Correct
    Wrong
  • 3
    50%
    Correct
    Wrong
  • 4
    51%
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 4. "51%"
Explanation :

Q:

If efficiency of B increased by $$ {33{1\over 3}{\%}}$$ and A and B start work together, while at the same time C starts destroying the work. Find in how many days work will be completed?

1965 0

  • 1
    36 days
    Correct
    Wrong
  • 2
    48 days
    Correct
    Wrong
  • 3
    32 days
    Correct
    Wrong
  • 4
    28 days
    Correct
    Wrong
  • 5
    30 days
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "36 days"

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully