Aptitude Practice Question and Answer

Q:

The ratio of circumradius and hypotenuse a right-angled triangle is

1471 0

  • 1
    1 : 1
    Correct
    Wrong
  • 2
    2 : 3
    Correct
    Wrong
  • 3
    1 : 2
    Correct
    Wrong
  • 4
    2 : 1
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "1 : 2"

Q:

Find the difference between mean and median in the given data 2.5, 4.6, 7.2, 3.3, 4.9, 5.6, 2.7?

1471 0

  • 1
    0.2
    Correct
    Wrong
  • 2
    0.8
    Correct
    Wrong
  • 3
    1.2
    Correct
    Wrong
  • 4
    2.0
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "0.2"

Q:

A alone can complete a piece of work in 6 days and B alone can complete the same work in 8 days, then in how many days can A and B together complete the same work?

1471 0

  • 1
    $$ {24\over 7}$$
    Correct
    Wrong
  • 2
    $$ {48\over 13}$$
    Correct
    Wrong
  • 3
    $$ {26\over 7}$$
    Correct
    Wrong
  • 4
    $$ {35\over 13}$$
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 1. "$$ {24\over 7}$$"

Q:

Find the equation of the line that passing through the point (7, -5 ) and is perpendicular to  the line (4x+5y=1).

1470 0

  • 1
    4x-5y=33
    Correct
    Wrong
  • 2
    5x+4y=15
    Correct
    Wrong
  • 3
    5x-4y=55
    Correct
    Wrong
  • 4
    4x+5y=33
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "5x-4y=55"

Q:

The speed of a train is 4/7 of the speed of a car. The car covers 252 m. distance in 9 seconds. In what time will the train cover a distance of 64m.?

1470 0

  • 1
    3 sec.
    Correct
    Wrong
  • 2
    5 sec.
    Correct
    Wrong
  • 3
    4 sec.
    Correct
    Wrong
  • 4
    7 sec.
    Correct
    Wrong
  • 5
    None of these
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "4 sec. "

Q:

A can do $$ {4\over 5}$$ of a work in 20 days and B can do $$ {3\over 4}$$ of the same work in 15 days. They work together for 10 days. C alone completes the remaining work in 1 day.  B and C together can complete of $$ {3\over 4}$$ of the same work in:

1470 0

  • 1
    6 days
    Correct
    Wrong
  • 2
    8 days
    Correct
    Wrong
  • 3
    5 days
    Correct
    Wrong
  • 4
    4 days
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 3. "5 days"

Q:

Triangle PQR is inscribed in the circle whose radius is 14 cm . If PQ is the diameter of the circle and PR =10 cm , then what is the area of the triangle ? 

1470 0

  • 1
    196
    Correct
    Wrong
  • 2
    $$ {30{\sqrt{19}}}$$
    Correct
    Wrong
  • 3
    $$ {40\over 17}$$
    Correct
    Wrong
  • 4
    $$ {35{\sqrt{21}}}$$
    Correct
    Wrong
  • Show AnswerHide Answer
  • Workspace

Answer : 2. "$$ {30{\sqrt{19}}}$$"

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully

      Report Error

    Please Enter Message
    Error Reported Successfully