Quantitative Aptitude Practice Question and Answer
8Q: How many seconds in 10 years? 1678 05b5cc695e4d2b4197774c534
5b5cc695e4d2b4197774c534- 131523500 secfalse
- 2315360000 sectrue
- 3315423000 secfalse
- 4315354000 secfalse
- Show Answer
- Workspace
- SingleChoice
Answer : 2. "315360000 sec"
Explanation :
Answer: B) 315360000 sec Explanation: We know that, 1 year = 365 days 1 day = 24 hours 1 hour = 60 minutes 1 minute = 60 seconds. Then, 1 year = 365 x 24 x 60 x 60 seconds. = 8760 x 3600 1 year = 31536000 seconds. Hence, 10 years = 31536000 x 10 = 315360000 seconds.
Q: Albert invested Rs. 8000 in a scheme for 2 years at compound interest rate 5% p.a. How much amount will Albert get on maturity of the fixed deposit ? 1678 05b5cc6e7e4d2b4197774ed9c
5b5cc6e7e4d2b4197774ed9c- 1Rs. 8840false
- 2Rs. 8800false
- 3Rs. 8810false
- 4Nonetrue
- Show Answer
- Workspace
- SingleChoice
Answer : 4. "None"
Explanation :
Answer: D) None Explanation: Amount = 80001+51002 = 8000 x 21/20 x 21/20 = Rs. 8820
Q: What percent of a day is 3 hours? 1678 05b5cc69ae4d2b4197774c778
5b5cc69ae4d2b4197774c778- 114.9%false
- 212.5%true
- 315.6%%false
- 411.4%false
- Show Answer
- Workspace
- SingleChoice
Answer : 2. "12.5%"
Explanation :
Answer: B) 12.5% Explanation: Let p% of a day is 3 hrs. We know that a day has 24 hrs. => p x 24/100 = 3 => p = 300/24 => p = 12.5% Hence, 3 hrs is 12.5% of a day.
Q: Pavan and Sravan are two persons. If Pavan works with his actual efficiency and Sravan twice of his actual efficiency then it takes 25 days to complete the work. But If Pavan works twice of his actual efficiency and Sravan with his normal efficiency then the work is completed in 20 days. How many days would it take if Sravan alone works with his actual efficiency (in Days)? 1675 05b5cc6c7e4d2b4197774ded2
5b5cc6c7e4d2b4197774ded2- 150false
- 2100true
- 370false
- 435false
- Show Answer
- Workspace
- SingleChoice
Answer : 2. "100"
Explanation :
Answer: B) 100 Explanation: Let the Efficiency of pavan be E(P) Let the Efficiency of sravan be E(S) Here Work W = LCM(25,20) = 100 Now, E(P+2S) = 100/25 = 4 ....(1) E(2P+S) = 100/20 = 5 ....(2) Hence, from (1) & (2) we get E(S) = 1 => Number of days Savan alone work to complete the work = 100/1 = 100 days.
Q: A bag contains 4 red and 3 black balls. A second bag contains 2 red and 4 black balls. One bag is selected at random. From the selected bag, one ball is drawn. Find the probability that the ball drawn is red. 1675 05b5cc7d0e4d2b4197775121d
5b5cc7d0e4d2b4197775121d- 123/42false
- 219/42true
- 37/32false
- 416/39false
- Show Answer
- Workspace
- SingleChoice
Answer : 2. "19/42"
Explanation :
Answer: B) 19/42 Explanation: A red ball can be drawn in two mutually exclusive ways (i) Selecting bag I and then drawing a red ball from it. (ii) Selecting bag II and then drawing a red ball from it. Let E1, E2 and A denote the events defined as follows: E1 = selecting bag I, E2 = selecting bag II A = drawing a red ball Since one of the two bags is selected randomly, therefore P(E1) = 1/2 and P(E2) = 1/2 Now, PAE1 = Probability of drawing a red ball when the first bag has been selected = 4/7 PAE2 = Probability of drawing a red ball when the second bag has been selected = 2/6 Using the law of total probability, we have P(red ball) = P(A) = PE1×PAE1+PE2×PAE2 = 12×47+12×26=1942
Q: 1, 2, 8, 33, ? Find the next number in the given series? 1673 05b5cc6bae4d2b4197774d7e4
5b5cc6bae4d2b4197774d7e4- 1148true
- 2145false
- 3143false
- 4141false
- Show Answer
- Workspace
- SingleChoice
Answer : 1. "148"
Explanation :
Answer: A) 148 Explanation: 1 x 1 + 1 x 1 = (1 + 1) = 2 2 x 2 + 2 x 2 = (4 + 4) = 8 8 x 3 + 3 x 3 = (24 + 9) = 33 33 x 4 + 4 x 4 = (132 + 16) = 148 148 x 5 + 5 x 5 = (740 + 25) = 765.
Q: What should be the maximum value of B in the following equation?8A9 – 6B2 + 4C6 = 723 1670 05b5cc77fe4d2b419777501b0
5b5cc77fe4d2b419777501b0- 14false
- 21false
- 35false
- 47true
- Show Answer
- Workspace
- SingleChoice
Answer : 4. "7"
Explanation :
Answer: D) 7 Explanation: 1 1 8 A 9 + 4 C 6 - 6 B 2 7 2 3 We may represent the given sum, as shown below:1 + A + C - B = 12 A + C - B = 11 Now,giving the maximum values to A and C, i.e.A = 9 and C = 9, we get B = 7.
Q: 3 is what percent of 5? 1669 05b5cc64ae4d2b4197774bc0c
5b5cc64ae4d2b4197774bc0c- 145%false
- 260%true
- 372%false
- 480%false
- Show Answer
- Workspace
- SingleChoice
Answer : 2. "60%"
Explanation :
Answer: B) 60% Explanation: Here it is asked that 3 is what percent of 5 Let 3 is K percent of 5. => K x 5/100 = 3 => K = 300/5 = 60 Hence, 3 is 60% of 5.